In 2025 NATO allies agreed a new target of 5% of GDP for defence and security by 2035, made up of 3.5% for core defence and 1.5% for wider defence-related spending such as infrastructure and resilience [1]. Analysts disagree about how quickly European governments will get there, but they agree on where the strain will show. Allianz Trade's review a year on put it plainly: money is not the problem, capacity and delivery are [2]. Oxford Economics found orders running ahead of industrial capacity, with bottlenecks and price pressure as a result [3].
The UK is trying to widen its supplier base at the same time. The Defence Industrial Strategy 2025 sets a goal of increasing Ministry of Defence spending with small and medium-sized firms by £2.5 billion by May 2028 [4]. That means more companies doing defence work for the first time, and more existing suppliers taking on larger or more demanding parts.
Capacity is also a quality question
When a prime or Tier 1 brings in a new supplier, or moves work to a supplier that is growing quickly, it is taking a risk on whether that supplier can make good parts at rate and prove it. Much of that proof is measurement evidence. In my experience the questions come in a predictable order:
- Is there a working quality system? For aerospace and much defence work that means AS9100, or a credible plan to get there.
- Can you show the first parts are right? A complete AS9102 first article inspection, with every drawing characteristic accounted for.
- Are your instruments fit for the tolerance? Calibrated equipment with traceable certificates, ideally from a lab accredited to ISO/IEC 17025, and a measurement system analysis (such as a gauge R&R study) on the gauges that matter.
- Do you know your measurement uncertainty, and what you do with it? On tight tolerances a result close to the limit is only meaningful if you know how good the measurement was and have a decision rule for conformity, such as the guard-band approach in ISO 14253-1.
- Will it hold at rate? Capability data (SPC) on key characteristics, and an inspection process that will not become the bottleneck when volumes rise.
A supplier that can answer these questions with documents rather than reassurance gets through approval faster, and is easier to place more work with.
Large parts make it harder
Defence platforms bring their own measurement problems: large welded and machined structures, assemblies that are measured in jigs with laser trackers, and parts that move between sites. A tracker can measure to tens of micrometres over several metres, but only if the set-up, environment and network of stations are right. Thermal expansion on a large steel structure can easily exceed a tight positional tolerance if part temperature is not controlled or compensated. These are the measurements most likely to be questioned during approval, and the ones where a short uncertainty analysis before the first article saves the most argument afterwards.
A practical readiness list
- List every instrument used for acceptance, its calibration status and the certificate's uncertainty.
- Pick the five tightest or most safety-relevant characteristics and check that the measurement uncertainty is a small fraction of each tolerance. Write the result down.
- Run a gauge study on the gauges and fixtures used for those characteristics.
- Agree a written decision rule for results near a limit, and make sure it matches what the customer expects.
- Prepare a template FAI package that maps drawing characteristics to the inspection program, so new parts start from a proven structure.
- For large-volume measurement, document the tracker set-up, environment checks and interim tests (ISO 10360-10 or ASME B89.4.19).
Where to start
If you are preparing for a first defence contract, or for a step up in volume, start with the measurement evidence for the parts you will be judged on first. A short independent review of instruments, uncertainty and FAI readiness is far cheaper than a rejected first article or a supplier corrective action request in the first month of production.
References
- NATO. Funding NATO (The Hague summit commitment, 2025).
- Allianz Trade. European defense one year on: money is not the problem, capacity (and delivery) are.
- Oxford Economics. Rearming Europe: capacity and fiscal constraints cap the economic dividend.
- UK Government (2025). Defence Industrial Strategy 2025: Making Defence an Engine for Growth.
- McKinsey & Company. Cutting Europe's €800 billion Gordian knot: five catalysts to transform defense.
- ISO 14253-1:2017. Geometrical product specifications (GPS): Inspection by measurement of workpieces and measuring equipment, Part 1: Decision rules for verifying conformity or nonconformity with specifications.